Showing posts with label Power. Show all posts
Showing posts with label Power. Show all posts

Monday, February 18, 2013

A very sunny and productive Friday!

Friday was a great day at the sawmill. Everyone was busy, and the sun was out as an added bonus. We wish the warm weather lasted a few days longer. Here are some wonderful pictures we wanted to share!

Trucker off-loading more "Sandy Logs"

John working on the power unit

Glen preparing some tools for the day

John instructing one of our key men

Lloyd and Bruce laying out base for the conveyor 

Beautifully unique urban logs

Willem working on the metal detector system

Sawing large diameter logs on the Mighty Might

Thursday, September 13, 2012

Beginnings of Power at Newark

The day began as a crane moved pieces of the unit off the truck and into place.


By the end of the day, phase one of the power station install is completed.



Yesterday marked phase one of CitiLog Newark's power station install. Our team worked throughout the day as components of the station were delivered on to the site. With the assistance of the crew, a large crane positioned the components into place.

Once the power unit is complete our site will be 100% self-sufficient; producing our own electricity, heating, and eventually cooling. Due to the unique characteristics of urban trees such as holes, rot, metal containment, etc., urban areas have a high rate of unusable and disposable wood. CitiLog uses this disposable wood to create green power.

CitiLog will have more updates following our power station install in the weeks to come!”